RECENT PROJECTS

  1. Smiths Falls VIA Train in motion at rail yards

    July 24, 2023
    I had some time to myself on Sunday afternoon so thought it would be good to make some pictures at the Smiths Falls Train Yards of Via Trains passing through. Made with a perspective control lens each of these pictures is made up of 3 individual frames composited together as…

  2. The Supreme Court of Canada

    July 21, 2023

  3. IKEA - Ottawa

    July 15, 2023
    IKEA in Ottawa photographed July 14, 2023 - made during blue hour and uploaded onto Google Maps July 15 and is now IKEA’s Google Maps cover image A more edited version below.

  4. 90 Elgin Street Ottawa

    July 13, 2023
    90 Elgin Street in Ottawa. Photographed on Wednesday, July 12, 2023 by Frank Fenn, IDEA3

  5. Strategic Property Branding Photography Plan Part 3 - Critical Path

    July 3, 2023
    A plan without actionable deadlines is doomed to fail in achieving objectives. A Critical Path set in reverse chronological order is a simple and effective way to keep focused on your project’s end-game execution. If you would like a Word document of this send me an email at FF@IDEA3.CA

  6. What are Property Managers looking for in pictures of their properties?

    July 1, 2023
    Strategic Property Branding Photography Plan Part 2 Having been the Marketing Director for several Property Management companies I wanted to know what ChatGPT would come up with. They ring true so I’m sharing them here; the first three are from ChatGPT, and I’ve added 4 and 5 to make it…

  7. Architectural Landscapes along the Rideau Canal in Ottawa

    June 29, 2023
    Last night (after meeting with two Santas to plan 2023’s Holiday season, it’s only 4 months away!) I went into downtown Ottawa to drop a package off for my youngest (how is it possible they are 21 already?).Wanting fresh ideas I asked if there were any interesting buildings worth photographing…

  8. Strategic Property Branding Photography Plan Part 1

    June 26, 2023
    The 3-Step Audit: Start with where you are  (aka Situational Analysis) To position your property owner/management company as professionally operated your visual assets need to be in focus with straight lines while being consistent in their colour palette, ratios, and sizing. Step #1 - What is Your Current…

  9. AI Fun

    June 8, 2023
    Looking back at that time I photographed old cars in the desert with the snowcap mountains in the background.But I didn’t.Adobe recently released their Beta AI in Photoshop and, like almost every photographer on the planet, I began experimenting to see if I could augment reality in a believable way.The…

  10. Mill of Kintail in Almonte, Ontario

    May 24, 2023

  11. Port Elmsley Drive-In Theatre in Black and White

    May 22, 2023
    For the “Museum Collection” - Port Elmsley Drive-In, Port Elmsley Ontario (halfway between Smiths Falls and Perth).

  12. Ottawa Board of Trade and a walk down Sparks Street

    May 20, 2023
    Thirty years ago this man, James McNeil RPA, LEED AP (and Shari Geekie), interviewed and hired me to be the marketing coordinator at Hazeldean Mall. And here we were in a photo booth at the Ottawa Board of Trade “Ottawa is Open for Business” event at Canderel’s Constitution Square. When…

  13. A New House: Images for use-by-owner to rent the house to tenants

    May 13, 2023
    I was contacted by the owner of a house in a new Smiths Falls development. As the unit is an investment he needed pictures to share on rental sites to get it occupied as soon as possible.  While the building is almost completed and the rest of the community is…

  14. Smiths Falls Panoramics Part 1 - Community Centre Park Area

    May 11, 2023
    Years ago I was on a long train ride with a former golf pro and he told me that the old saying “Practice makes perfect” is wrong. “Frank, perfect practice makes perfect.” Each of these pictures is actually 8 pictures stitched together.  When making panoramics you need to follow and…

  15. Canadian Museum of Science and Technology

    May 7, 2023

  16. Pole Photography

    May 5, 2023
    I was at a Christmas Party last December and I brought up that I do Pole Photography The person got very excited and asked me if I had done Pole Dancing Photography long. “Ummm, no, not that type of Pole Photography” I attach my camera onto an extension pole (the…

  17. P3 Panel Company and United Edge Structural Components

    April 22, 2023
    Sharing the story of P3 Panel Company and United Edge Structural Components (Smiths Falls) through photographs Drone Photography of the Factory Ground Level  of the yard and building Pole photography inside the factory People at work - shot in colour however, when shared in black and white the images take…

  18. Montanas Peterborough Ontario

    April 11, 2023

  19. Canadian Museum of Nature

    April 11, 2023

  20. Structube St Catharines

    April 11, 2023

  21. Minto Bridge Ottawa

    March 28, 2023

  22. Canadian War Museum

    March 11, 2023
    Personal Project: Ottawa’s Museums Part 1 Canadian War Museum - opened in 2005 Link to wikipedia:https://en.wikipedia.org/wiki/Canadian_War_Museum  Link to official site: https://www.warmuseum.ca/ 

  23. U Ottawa area cityscapes

    March 1, 2023
    Perspective control images made on a winter’s walk around downtown Ottawa, Ontario.

  24. Almonte Waterfalls

    February 21, 2023
    Before and After Edit.Grand Falls on Mississippi in Almonte, Ontario.Five-second exposure, photographed using shift lens with ND1000 filter in February 2023, composited in layers, and edited in Photoshop CC.

  25. A&W Winchester

    February 7, 2023
    The above photographs were stitched together images (five photographs to make each) photographed using a 24mm perspective control lens (tilt-shift) to create a full panoramic image at high-resolution. For comparison’s sake, I also made the below picture with my iPhone.  Winter (and the early afternoon) isn’t an ideal time to…

Using Format